Precision, technology and craft under one roof. Every machine works from the same digital model, from raw material to finished piece
Up to
These are maximum outputs per production line at full allocation, not concurrent totals across all lines. Project lead times are confirmed in writing at order stage.
The fleet was substantially renewed in the 2021 modernisation programme and runs fully integrated through IMOS, coordinating design directly to manufacture.
We crate, ship and install with our own teams. On hospitality projects that open in stages, delivery is phased to match the programme — floor by floor if that is what the site needs. The people who install your furniture work for the company that made it.
1991 · 35,000 M² CAMPUS · 5 DIVISIONS · RESPONSE WITHIN 2 WORKING DAYS